Select Page

PSQHWS-3 HWS – Instantaneous

We have recently identified that the hot water service on site is in poor condition and is unrepairable. We suggest replacing the hot water service in the near future.   This quote is to: * Disconnect the existing Hot Water Service. * Supply and install 1 x new...

PSQHWS-2 HWS – Storage – Gas

We have recently identified that the hot water service on site is in poor condition and is unrepairable. We suggest replacing the hot water service in the near future.   This quote is to: * Disconnect the existing Hot Water Service. * Supply and install 1 x new...

PSQHWS-1 HWS – Storage – Electric

We have recently identified that the hot water service on site is in poor condition and is unrepairable. We suggest replacing the hot water service in the near future.   This quote is to: * Disconnect the existing Hot Water Service. -* Supply and install 1 x new...

PSQWAT-15 Water Meter – Raise RPZ Valve to Comply

We have recently been to the above property and found that the existing Back Flow Prevention device does not comply with the codes of practice.  As per code the valve is required to have a clearance of 300mm under the valve to make this comply.   We will carry...

PSQWAT-14 Water Meter – Install RPZ Valve Cut Concrete

We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention).   We will carry out the following: * Excavate around the outlet of the existing water meter, cutting concrete with road saw and jack hammer. *...

PSQWAT-13 Water Meter – Install RPZ Valve

We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention).   We will carry out the following: * Excavate around the outlet of the existing water meter. * Expose and prepare the outlet service. * Isolate...