Select Page

PSQHWS-9 HWS – Element Replace

We have recently identified that the element in the hot water service is faulty. We suggest replacing the element in the near future.   This quote is to: * Supply and install 1 x new element * Make good the connections as needed * Test   All works will be...

PSQHWS-8 Tempering Valve – Replace Existing

We have recently had complaints that the hot water temperature at the above address is dangerously TOO HOT.  We note that the current standards require the temperature to be no more than 50°C at a tap for a bath, shower and basin.   There is currently an existing...

PSQHWS-7 Tempering Valve – Install New

We have recently had complaints that the hot water temperature at the above address is dangerously TOO HOT.  We note that the current standards require the temperature to be no more than 50°C at a tap for a bath, shower and basin.  This quote is to carry out works...

PSQHWS-6 Replace Instantaneous with Storage Electric

We have recently identified the Instantaneous under bench Hot Water Service to be in poor condition and suggest replacement in the near future.  We recommend replacing the heater with a Mains Pressure Hot Water Service 25 litre plug in 25 litre hardwired 50 litre 80...

PSQHWS-5 Replace Gravity Fed with Storage Electric

We have recently identified the Gravity Fed Hot Water Service to be in poor condition and suggest replacement in the near future.  We recommend replacing the heater with a Mains Pressure Hot Water Service 25 litre plug in 25 litre hardwired 50 litre 80 litre 125 litre...

PSQHWS-4 HWS – Boiler Unit

We have recently identified that the boiler unit on site is in poor condition and is unrepairable. We suggest replacing the boiler unit in the near future.   This quote is to: * Disconnect the existing Boiler Unit. * Supply and install 1 x new 265 litre 275 litre...