Select Page

We have recently identified the Instantaneous under bench Hot Water Service to be in poor condition and suggest replacement in the near future.  We recommend replacing the heater with a Mains Pressure Hot Water Service hot water service.

 

This quote is to:

* Disconnect the hot water service in the roof space and drain the tank.

* Put 1 x 600mm concrete pad down to level up the new heater.

* Supply and install hot water service.

*  Supply and install new electrical circuit at fuse board and connection to heater

* Supply Duo Control Valve and new Tempering Valve.

* Connect to the cold water service at low level.

* Re-run the hot water down the wall out the eave and connect to the new tank position.

* Have the electricity re-run the same way down the wall to connect to the power, if required.

* Test and commission the tank leaving the old tank in the roof space and empty.

* Remove rubbish from site.

 

All works will be carried out to Australian Standards AS3500 and will be within OH&S Guidelines.