by admin | Dec 18, 2014 | Quotes
We have recently been to the above property and found that the existing Back Flow Prevention device does not comply with the codes of practice. As per code the valve is required to have a clearance of 300mm under the valve to make this comply. We will carry...
by admin | Dec 18, 2014 | Quotes
We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention). We will carry out the following: * Excavate around the outlet of the existing water meter, cutting concrete with road saw and jack hammer. *...
by admin | Dec 18, 2014 | Quotes
We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention). We will carry out the following: * Excavate around the outlet of the existing water meter. * Expose and prepare the outlet service. * Isolate...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to attend to the backflow prevention device. We carried out the tests as needed and found it to fail the test. We were required to supply and install 1 x new service kit as required and then re test the valve. We tested the device...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend to the above site as there was a report that the back flow prevention devices needed to be tested on site. We carried out the tests as needed and found it to fail the test. We were required...