Select Page

PSQWAT-15 Water Meter – Raise RPZ Valve to Comply

We have recently been to the above property and found that the existing Back Flow Prevention device does not comply with the codes of practice.  As per code the valve is required to have a clearance of 300mm under the valve to make this comply.   We will carry...

PSQWAT-14 Water Meter – Install RPZ Valve Cut Concrete

We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention).   We will carry out the following: * Excavate around the outlet of the existing water meter, cutting concrete with road saw and jack hammer. *...

PSQWAT-13 Water Meter – Install RPZ Valve

We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention).   We will carry out the following: * Excavate around the outlet of the existing water meter. * Expose and prepare the outlet service. * Isolate...

PSQWAT-12 Water Meter – Pressure Limiting Valve

We recently identified that installation of a Pressure Limiting Valve at the Water Meter to reduce the water pressure from 700kpa to 500kpa is required on site.  This will help all of your fixtures so that there is not so much pressure on them.  This will reduce the...

PSQWAT-11 Water Meter – Relocate Cut Concrete

We recently identified that the water meter on site requires relocating.   We will carry out the following: * Excavate around the inlet of the existing water meter, Cutting concrete with road saw and jack hammer. * Expose and prepare the inlet service. * Isolate...