by admin | Dec 19, 2014 | Invoices
Account for works on site. We have recently been engaged to attend to the above property after hours as an emergency call out. Upon arrival we identified the main control valve was leaking. To reduce property damage, we were required to replace the tap...
by admin | Aug 29, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty control valve. Upon inspection we identified that the top assembly on the control valve to be faulty and required replacement. We isolated the cold water supply to the premises, drained the pressure from the service...
by admin | Aug 29, 2014 | Invoices
Account for works on site. We were recently engaged to attend the above property and assess the problem with the control valve. Upon inspection we identified that the top assembly on the control valve to be faulty and required replacement. We isolated the cold water...