by admin | Dec 18, 2014 | Quotes
We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention). We will carry out the following: * Excavate around the outlet of the existing water meter, cutting concrete with road saw and jack hammer. *...
by admin | Dec 18, 2014 | Quotes
We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention). We will carry out the following: * Excavate around the outlet of the existing water meter. * Expose and prepare the outlet service. * Isolate...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to attend to the backflow prevention device. We supplied and installed 1 x new RPZ valve with all associated pipe work and fittings to make good connection to the water service. We completed the online forms with Sydney Water to...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend to the above site as there was a report that the back flow prevention devices needed to be installed. We supplied and installed 1 x new RPZ valve with all associated pipe work and fittings...