Select Page

PSQWAT-14 Water Meter – Install RPZ Valve Cut Concrete

We recently identified that an RPZ Valve must be supplied and installed on the above property (Back Flow Prevention).   We will carry out the following: * Excavate around the outlet of the existing water meter, cutting concrete with road saw and jack hammer. *...

PSQWAT-11 Water Meter – Relocate Cut Concrete

We recently identified that the water meter on site requires relocating.   We will carry out the following: * Excavate around the inlet of the existing water meter, Cutting concrete with road saw and jack hammer. * Expose and prepare the inlet service. * Isolate...