Select Page

PSTOI-2 Inlet Valve & Outlet Washer combo service

We have recently been asked to provide a quote to service the toilet cistern on site. Noted that the inlet valve needs to be replaced and replace the outlet washer to complete the repairs.   Scope of works being. – Isolate the water supply to the cistern....

PSTOI-1 Inlet Valve

We have recently been asked to provide a quote to service the toilet cistern on site. Noted that the inlet valve needs to be replaced to complete the repairs. Scope of works being. – Isolate the water supply to the cistern. – Remove the old inlet valve....

PSQROOF-11 Cleanout Gutters

We have recently attended the above property and while we were on site it was raining quite heavily. We identified that the gutters were overflowing at the front of property. rear of property. left hand side of the property. right hand side of the property. Due to the...

PSQROOF-10 Replace Rusty Nozzle

We have recently attended the above property and have found that a downpipe had fallen away from a rusty nozzle.  We will be required to gain access to the gutter and remove the old nozzle and supply & install 1 x new nozzle to suit the application.   We will...

PSQROOF-9 Preservation of Gutter

We have recently attended the above property and have identified the box gutter to be in fair condition but there are true signs of surface rust coming though.  As a precaution to attempt to get longer life out of the existing box gutter we propose to apply a membrane...

PSQROOF-8 Squashed Downpipes

We have recently attended the above property and have identified that the base of downpipes had been squashed, which may be due to the ground moving.  Due to the inefficiency of a squashed downpipe during heavy rain, it will back up and over flow which could create...