by admin | Aug 29, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty control valve. Upon inspection we identified that the top assembly on the control valve to be faulty and required replacement. We isolated the cold water supply to the premises, drained the pressure from the service...
by admin | Aug 29, 2014 | Invoices
Account for works on site. We were recently engaged to attend the above property and assess the problem with the control valve. Upon inspection we identified that the top assembly on the control valve to be faulty and required replacement. We isolated the cold water...
by admin | Aug 29, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty taps. We investigated and found that the ceramic disk hob taps in the shower basin sink tub in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs ensuite ensuite main bathroom female...
by admin | Aug 29, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there were reports of the taps being faulty. We investigated and found that the ceramic disk hob taps in the shower basin sink tub in the downstairs main bathroom upstairs main bathroom...
by admin | Aug 29, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty taps. We investigated and found that the ceramic disk wall taps in the shower basin sink tub in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs ensuite ensuite main bathroom female...
by admin | Aug 29, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there were reports of the taps being faulty. We investigated and found that the ceramic disk wall taps in the shower basin sink tub in the downstairs main bathroom upstairs main...