by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst on site we ran the CCTV camera and found clear evidence that there were issues within the line. We ran the CCTV camera and found clear evidence that there were issues within the line. From our point of entry we discovered issues and located problems to be...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently attended site to run the CCTV camera and provide a condition report for the line. We ran the CCTV camera and found clear evidence that there were issues within the line. From our point of entry we discovered issues and...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend to the above site as there were reports of a blocked sewer. We set up and ran the water jet as needed. We investigated further and we were able to confirm the blockage must be a boards main choke. We...
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst on site we were advised of a blockage in the shaft. inspection opening. stack access point. floor waste. gully. vent. drain. Upon our investigations we were unable to simulate a blockage. We tested all the fixtures on site thoroughly and all drainage lines...
by admin | Aug 26, 2014 | Invoices
We have recently been called to the above site in relation to a blocked shaft. inspection opening. stack access point. floor waste. gully. vent. drain. Upon our investigations we were unable to simulate a blockage. We tested all the fixtures on site thoroughly and all...