by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and identified that we needed to access the drainage by removing the toilet pan in the downstairs main bathroom....
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noticed there was a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent. drain. We set up and established the water jet and ran the jet hose down the...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent. drain....
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noticed there was a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent. drain. We set up and established the water jet and ran the jet hose down the at...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and foundĀ that the blockage was at theĀ shaft. inspection opening. stack access point. floor waste. gully. vent....