Select Page

PSE-17 – Stormwater Pits Cleared

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out during heavy rains.  Upon inspection we identified that the existing stormwater pits were full of dirt and leaf matter and were not...

PSE-04 – Stormwater Blocked – Water Jet

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out during heavy rains. Upon inspection we identified that the existing stormwater system was not coping with the amount of water and there...