Select Page

PSBD-51 Blocked Sewer Water Jet – Not Cleared

Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent. drain....

PSBD-49 Blocked Sewer Water Jet – Cleared

Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and foundĀ that the blockage was at theĀ  shaft. inspection opening. stack access point. floor waste. gully. vent....