by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that the inlet water pipe work was leaking. We found it was beyond repair and needed to be replaced. We supplied and installed 1 x new braded hose to...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of faulty hot water. We investigated and were able to identify that the inlet water pipe work was leaking. We found it was beyond repair and needed to...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that the tempering valve was not set right and needed to be adjusted. We adjusted the temperature and set as needed to assure the temperature is...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of faulty hot water. We investigated and were able to identify that the tempering valve was not set right and needed to be adjusted. We adjusted the...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that the tempering valve was faulty and needed to be replaced. We supplied and installed 1 x new Tempering valve and made good the connection to the...