by admin | Dec 19, 2014 | Invoices
Account for works on site. We have recently been engaged to attend to the above property after hours as an emergency call out. Upon arrival we identified that there was a water leak and that the flexi connector under the vanity basin toilet in the downstairs...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that the inlet water pipe work was leaking. We found it was beyond repair and needed to be replaced. We supplied and installed 1 x new braded hose to...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of faulty hot water. We investigated and were able to identify that the inlet water pipe work was leaking. We found it was beyond repair and needed to...
by admin | Oct 27, 2014 | Invoices
Whilst on site we were asked to inspect the faulty toilet. Upon inspection we identified that the cistern in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs ensuite ensuite main bathroom female bathroom male bathroom laundry...
by admin | Oct 27, 2014 | Invoices, Secondary Task
Account for works on site. We were recently engaged to attend the above property and assess the problem with the toilet. Upon inspection we identified that the cistern in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs...