by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently attended site to run the CCTV camera and provide a condition report for the line. We ran the CCTV camera and found clear evidence that there were issues within the line. From our point of entry we discovered issues and...
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noticed there was a blocked sewer. We ran the water jet down the sewer from the shaft inspection opening stack access point floor waste gully vent drain and managed to clear the blockage. We then ran the CCTV camera to give a condition report...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We were recently engaged to attend the above property and assess the problem with the blocked sewer. Upon arrival we identified that the sewer was blocked and in need of water jetting. We ran the water jet down the sewer from the shaft...