by admin | Oct 30, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty cistern. We carried out investigations and were able to identify that the button assembly was faulty in the wall of the water wafer in-wall cistern was faulty and needed to be replaced. We source the...
by admin | Oct 30, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a faulty cistern. We carried out investigations and were able to identify that the button assembly was faulty in the wall of the water...
by admin | Oct 27, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty toilet. We investigated and found the button assembly inside the cistern was beyond repair and needed to be replaced. We supplied and installed 1 x new button assembly in the toilet in the downstairs main bathroom....
by admin | Oct 27, 2014 | Invoices
Account for works on site. We have recently asked to attend the above site as there was a report of a faulty toilet. We investigated and found the button assembly inside the cistern was beyond repair and needed to be replaced. We supplied and installed 1 x new...