Select Page

PSBD-74 – Blocked Tundish – Plunge – Air Conditioner

Account for works on site. We have recently been asked to attend the above site as there was a report of a blocked tundish from the air conditioner. We applied chemicals to assist with breaking up the blockage and manage to plunge the line clear. All works completed...

PSE-18 – Sydney Water Choke

Account for works on site.   We were recently engaged to attend to the above property after hours as there were signs of a blocked sewer.  On arrival we managed to locate a point of entry into the house service line with our high pressure water jetting drain...

PSE-17 – Stormwater Pits Cleared

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out during heavy rains.  Upon inspection we identified that the existing stormwater pits were full of dirt and leaf matter and were not...

PSE-16 – Spot Dig IO

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out.  Upon arrival we identified that there was a blockage in the sewer stormwater but were unable to gain access to run the water jet as...

PSE-15 – Shower – MoFlow

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out.  Upon inspection we identified that the shower in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs...