by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noticed there was a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent. drain. We set up and established the water jet and ran the jet hose down the at...
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a blocked sewer. We investigated and found that the blockage was at the shaft. inspection opening. stack access point. floor waste. gully. vent....
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noted that the tundish was blocked. We investigated and found that there were no other fixtures on site that were blocked. We applied chemicals to assist with breaking up the blockage and managed to plunge the line clear.
by admin | Aug 26, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of a blocked tundish. We investigated and were able to identify that there was no other fixtures blocked on site. We applied chemicals to assist with breaking up the...
by admin | Aug 26, 2014 | Invoices, Secondary Task
Whilst we were on site we noted that the tundish was blocked. We investigated and found that there were no other fixtures on site that were blocked. We managed to plunge clear with hand plunge and tested all ok.