Account for works on site.
We have recently been asked to attend to the above site as there was a report that the thermostatic mixing valve needed to be installed.
We supplied and installed 1 x new TMV valve with all associated pipe work and fittings to make good connection to the water service.
We also completed the online forms with Sydney Water as needed to register install.
All works completed.