We recently identified that the water meter on site requires relocating.
We will carry out the following:
* Excavate around the inlet of the existing water meter
* Expose and prepare the inlet service.
* Isolate main water pipe for the house. (Note: Pipework will be prepared to keep the inconvenience to a minimum). A freeze on the inlet service is required.
* Carry out necessary alterations to the pipework as required.
* Test pipework, back fill and consolidate the ground; and patching concrete where required.
* Remove any rubbish from site.
All works will be carried out to Australian Standards AS3500 and will be within OH&S Guidelines.