Select Page

PSTOI-1 Toilets – Inlet Valve

Account for works on site.   We have recently been asked to attend the above site as there was a report of there being a faulty toilet. We carried out investigations and were able to identify that the inlet valve in the downstairs main bathroom upstairs main...

PSBD-73 Trap – Replace – Additional Task

Whilst on site we were asked to investigate issues with the blocked basin. sink. We investigated and found that there were no other fixtures blocked. We attempted to plunge clear but it was still draining slowly. We removed the trap underneath which was full of fat...

PSBD-72 Trap – Replace

We have recently been attended site in regards to a blocked basin. sink. We investigated and found that there were no other fixtures blocked. We attempted to plunge clear but it was still draining slowly. We removed the trap underneath which was full of fat and hair....

PSBD-71 Trap – Clean Out – Additional Task

Whilst on site we were asked to investigate issues with the blocked basin. sink. We investigated and found that there were no other fixtures blocked. We attempted to plunge clear but it was still draining slowly. We removed the trap underneath which was full of fat...

PSBD-70 Trap – Clean Out

We have recently been attended site in regards to a blocked basin. sink. We investigated and found that there were no other fixtures blocked. We attempted to plunge clear but it was still draining slowly. We removed the trap underneath which was full of fat and hair....