by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of too much water pressure. We supplied and installed 1 x new pressure reduction valve at the water meter and proved to drop the pressure. All works...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the water meter. We investigated and noted that the stuffing box was leaking on the main control valve. We packed and tightened as needed and proved to stop the leak. All works completed and tested all...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of leaks around the water meter. We investigated and noted that the stuffing box was leaking on the main control valve. We packed and tightened as needed and...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the water meter. We investigated and noted that the unions were leaking on the water meter. We manage to tighten as needed and stop the water leaking. All works completed and tested all...
by admin | Nov 21, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of leaks around the water meter. We investigated and noted that the unions were leaking on the water meter. We manage to tighten as needed and stop the water...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Please note: Due to the hot water service being extremely difficult to remove from site we gained permission to cut the tank up into sections which made it easier to remove then have it taken to the recycling yard.