Select Page

PSTAP-89 Tap – Shower Rose – Industrial

Account for works on site. We have recently been asked to attend the above site as there were reports of a faulty shower rose. We investigated and found that the shower rose in the OPTIONS (male shower, female shower) amenities in cubicle number [BLANK BOX] was beyond...

PSBD-76 Blocked Drain Plunge – Floor Waste – Balcony

Account for works on site. We have recently been asked to attend the above site as there was a report of a blocked floor waste on the balcony. We investigated and were able to identify that there was no other fixtures blocked on site. We plunged clear with the hand...

PSBD-74 – Blocked Tundish – Plunge – Air Conditioner

Account for works on site. We have recently been asked to attend the above site as there was a report of a blocked tundish from the air conditioner. We applied chemicals to assist with breaking up the blockage and manage to plunge the line clear. All works completed...

PSE-52 HWS – Replace Boiler Unit

Account for works on site.   We have recently been engaged to attend to the above property after hours as an emergency call out.  Upon arrival we identified that the boiler unit was beyond repair and in need of replacement.  The heater was 265 litre 275 litre...