by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the water meter. We investigated and noted that the unions were leaking on the water meter. We manage to tighten as needed and stop the water leaking. All works completed and tested all...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Please note: Due to the hot water service being extremely difficult to remove from site we gained permission to cut the tank up into sections which made it easier to remove then have it taken to the recycling yard.
by admin | Nov 21, 2014 | Invoices, Secondary Task
Please note: Whilst installing the new heater we were asked to install it in a new location. We are required to have both the hot and cold water pipe work re-run to suit the new application. Note the electrical wiring was required to be relocated to suit the...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. Upon inspection we were able to identify that the connections to the hot water service were leaking. We were required to tighten the fittings and confirm no leaks. All works...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that there was a 3 phase instantaneous hot water heater on site. Due to the age, style and condition of the heater it was more economical to have the...
by admin | Nov 21, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty hot water service. We investigated and were able to identify that the 3 phase instantaneous hot water heater on site was beyond repair and needed to be replaced. We provided an estimate which was approved to...