by admin | Oct 23, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty toilet. We carried out investigations and were able to identify that the inlet valve was faulty and the outlet washer needed to be replaced in the downstairs main bathroom upstairs main bathroom downstairs...
by admin | Oct 23, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a faulty toilet. We carried out investigations and were able to identify that the inlet valve was faulty and the outlet washer needed to...
by admin | Oct 23, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty toilet. We carried out investigations and were able to identify that the inlet valve in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs ensuite ensuite main bathroom female...
by admin | Oct 23, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a faulty toilet. We carried out investigations and were able to identify that the inlet valve in the downstairs main bathroom upstairs main...
by admin | Sep 2, 2014 | Invoices, Secondary Task
Whilst on site we were asked to investigate issues with the blocked basin. sink. We investigated and found that there were no other fixtures blocked. We attempted to plunge clear but it was still draining slowly. We removed the trap underneath which was full of fat...