by admin | Oct 30, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there was a report of a leak from the toilet. We investigated and found that the leak was coming from the flush pipe at the rear of the toilet in the...
by admin | Oct 30, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty toilet. We carried out investigations and were able to identify that the inlet valve in the downstairs main bathroom upstairs main bathroom downstairs ensuite upstairs ensuite ensuite main bathroom female...
by admin | Oct 30, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a faulty toilet. We carried out investigations and were able to identify that the inlet valve in the downstairs main bathroom upstairs...
by admin | Oct 30, 2014 | Invoices, Secondary Task
Whilst on site we were asked to inspect the faulty urinal. We investigated and were able to confirm that the urinal was constantly running. We found that the battery was flat and needed to be replaced. We sourced a new battery as needed and made good connection...
by admin | Oct 30, 2014 | Invoices
Account for works on site. We have recently been asked to attend the above site as there was a report of there being a faulty urinal. We investigated and were able to confirm that the urinal was constantly running. We found that the battery was flat and...