by admin | Mar 17, 2015 | Invoices
Account for works on site. We have recently been asked to attend to the above site in relation to the leak that was reported under the (basin., kitchen., laundry tub., sink.) We investigated and found that the leak was coming from the plug and waste. We removed the...
by admin | Mar 17, 2015 | Invoices, Secondary Task
Whilst on site we were asked to investigate reports of a blocked floor waste in the OPTIONS (kitchen, downstairs main bathroom, upstairs main bathroom, downstairs ensuite, upstairs ensuite, main bathroom, ensuite, female bathroom, male bathroom, laundry, powder room)....
by admin | Mar 17, 2015 | Invoices
Account for works on site. We have recently been asked to attend to the above site as there were reports of a blocked floor waste in the OPTIONS (kitchen, downstairs main bathroom, upstairs main bathroom, downstairs ensuite, upstairs ensuite, main bathroom, ensuite,...
by admin | Mar 17, 2015 | Invoices
Account for works on site. We have recently been engaged to attend to the above property after hours as an emergency call out. Upon arrival we identified that the stormwater sewerwas blocked and in need of water jetting. We ran the water jet down the...
by admin | Mar 17, 2015 | Invoices, Secondary Task
Whilst on site we were asked to attend the above site as there were reports of a faulty shower rose. We investigated and found that the shower rose in the OPTIONS (male shower, female shower) amenities in cubicle number [BLANK BOX] was beyond repair and required...