Account for works on site.
We have recently been asked to attend the above site as there were reports of problems with the taps.
We investigated and identified that the flexy connector was faulty and in need of replacement.
We isolated the water and removed the existing connector. We supplied and installed 1 x new flexy connector and reinstated the connection to the fixture.
We reinstated the water supply and found to test all ok.