Account for works on site.
We have recently been asked to attend the above site as there was a report of dripping taps.
We investigated and identified that the taps in the sink in the
were dripping.
We isolated the water and carried out a full service on the , reseating the bodies as needed. We also supplied and installed Aqua Lock Modular Jumper Valves to suit.
We reinstated the water supply and found to test all ok.