Select Page

Whilst on site we were asked to inspect the dripping taps.

We investigated and identified that the taps in the basin in the
were dripping.
We isolated the water and carried out a full service on the , reseating the bodies as needed. We also supplied and installed Aqua Lock Modular Jumper Valves to suit.

We reinstated the water supply and found to test all ok.