Whilst on site we were asked to inspect the faulty hot water service.
We investigated and were able to identify that the hot water boiler on site was beyond repair and needed to be replaced.
We supplied and installed 1 x new hot water boiler unit as per approval.
We made good connection to the hot and cold water as needed.
We tested and commissioned as per specifications. All works completed.