Account for works on site.
We have recently been asked to attend the above site as there was a report of there being a faulty cistern.
We carried out investigations and were able to identify that system was a Pubco style flushing system. We found that the kit needed to be sourced and replaced in side flushing assembly within the valve.
We source the appropriate materials and then commissioned as needed in the
We made good the connection, reinstated the water supply and found to test all ok.