Account for works on site.
We have recently been asked to attend the above site as there was a report of there being a faulty cistern.
We carried out investigations and were able to identify that the inlet valve on the water wafer in-wall cistern was faulty and needed to be replaced.
We sourced the appropriate materials and commissioned as needed in the cistern in the
We made good the connection, reinstated the water supply and found to test all ok.