Account for works on site.
We have recently been asked to attend the above site as there was a report of there being a faulty toilet.
We carried out investigations and were able to identify that the bottom inlet valve in the toilet was faulty.
We coordinated materials as needed and supplied and installed 1 x new bottom inlet valve.
We made good the connection, reinstated the water supply and found to test all ok.