Account for works on site.
We have recently been asked to attend the above site as there was a report of the pan and cistern needing to be replaced.
We carried out investigations and were able to identify that the suite needed to be replaced.
We coordinated materials as needed and supplied and installed 1 x new toilet suite in the
We made good the connections, reinstated the water supply and found to test all ok.